The can crusher is mainly used to crush a variety of cans, cola bottles, etc., and is also suitable for installation and adjustment of waste tyre crusher equipment. It actually includes the website content of the can crusher’s assembly line, immobilization, start-up testing, production and manufacturing adjustments, etc. In summary, it is called installation. The installation site conditions of different customers' equipment are different, so in order to carry out the installation work smoothly, in the short term, the equipment raw materials will be installed and fixed, and the actual installation process will be standardized.
1. According to the plan drawing of the on-site installation design concept, the installer develops the simple and satisfactory layout of the equipment to ensure that the equipment does not interfere with each other and ensure the life safety of the personnel during the installation;
2. According to the installation labor amount of the can crusher, carry out the effective allocation and distribution of personnel to avoid chaos. In addition, it is obliged to assign people to ensure the orderly development of installation;
3. The installer’s work site content, work special tools, cranes and other raw materials are prepared in advance, and the site is pre-installed for precise positioning and anchor bolts (composition: the top of the head and the extruder screw) are intact;
4. The waste tyre shredder machine is hoisted to the site, and the management personnel will check and inspect the equipment parts to ensure that the parts are not ignored or destroyed. On this basis, the equipment is transferred
Installation personnel, enter the site in an orderly manner to carry out equipment inspection, corrective action, and actual installation operations;
5. After the equipment is installed and installed, the installer shall conduct inspections and maintenance of the spare parts, and carry out oil lubrication after the complete installation, and carry out the entire equipment cleaning;
6. Technical personnel are present on the equipment (to carry out overall installation and inspection to determine the accuracy;
7. Technical personnel cooperate with equipment maintenance workers and electric welders to carry out on-site debugging and testing of connected power equipment, inspect the production and manufacturing status, and adjust the detailed equipment website content such as the particle size distribution of the equipment feed and work efficiency;
8. After the equipment is turned on normally, the manufacturer and the technical personnel shall carry out the equipment safety operation and carry out the signature confirmation.