Service Tel:+86-371-53762053
Tel/whatsapp/wechat:+86-13674998188 (24 hours online)
E-mail:
zhengzhouyuxi@yuximachine.com
Add:Economic And Technological Development Zone, Zhengzhou, Henan, China (Mainland)
2. Before starting, carefully check the tightening of various parts of the crusher, the elasticity of the spring, and the tension of the belt.
3. Every time you start, you should carefully check whether the tooth plate of the crusher is loose, and adjust it to the mouth of the jaw according to the particle size of the material; if abnormal conditions are found, stop working, thoroughly deal with and eliminate the fault.
4. After the crusher is started, the running speed reaches the normal speed before feeding: strictly prevent steel and super-hard objects from entering the machine to avoid damage to the machine parts.
5. During operation, any cleaning work and installation and removal of the belt are strictly prohibited; it is forbidden to remove the broken object from the loading port or move the position of the broken object by hand or stalk.
6. Before stopping, the material supply must be stopped, and only after the materials in the crusher have been spat out can it be stopped.
7. After stopping, the scene can only leave after finishing.
8. Crusher should be dedicated, and clearly marked, mixed-use is strictly prohibited.
9. The crusher is regularly maintained by a dedicated person, and lubricating oil is regularly added to each active part, and the operation record is established.
10. The crusher is dismantled and maintained twice a year and the whole machine is repaired every two years; and maintenance and maintenance records are established.