The waste tire shredder machine is a versatile large-scale tire recycling machine. The equipment has high speed and high power. The work process of the tyre shredder is uncontrollable. Improper installation and operation habits of equipment can lead to equipment safety hazards and even damage to personal safety. As a professional tire shredder equipment manufacturer, Xiaobian today explains the installation process of the equipment in detail.
Preparation of tyre recovery machine before installation:
1. Survey of the installation site
According to the requirements of the mechanical equipment production line, the customer organizes the relevant personnel composed of the installation team members and technicians to go to the construction site to conduct the survey of the installation site, and do the site leveling and compaction work according to the crane docking position during installation. According to the situation of the site survey, the technicians organize the planning of the equipment installation plan. According to the site conditions of the construction site and the model and production process of the equipment, the customer plans or the tire shredder manufacturer to assist in the determination. In the condition and equipment load situation, the pile foundation and the bearing platform are planned, and the construction is strictly carried out according to the design requirements and construction drawings.
2. Detection of the front tyre shredder device before installation
Before the tire recycling machine is installed, the customer company arranges the maintenance and installation personnel to inspect, repair and maintain the equipment in advance. After the preparation work is completed, the relevant technical personnel, safety personnel, maintenance personnel, etc. carry out the quality inspection work before the installation of the equipment, focusing on the high-strength connecting bolts, steel structure welds, pins, wire ropes, safety devices and other important parts one by one. Inspection, discovery of hidden dangers, timely renovation, signed by the relevant personnel to confirm the preparation for equipment installation.